⢠±32.1-acre fully engineered industrial site with ±20.5 acres of developed gravel laydown and ±11.6 acres for future expansion.⢠Direct Highway 881 access via a custom interchange and ±530 m all-weather gravel road built to provincial standards.⢠Heavy-duty engineered gravel surface designed for year-round storage of equipment, pipe, modules and tanks.⢠Turnkey opportunity with major site preparation complete, saving years of development time and capital.⢠Prime oil sands location adjacent to CNRL Kirby SAGD and near major Cenovus, Imperial, Suncor and Husky operations.⢠Highway 881 twinning underway, enhancing access and future staging yard potential. (id:27476)